Precautions for Using Electric Control Valves

1. To ensure the production process continues during valve malfunctions or maintenance, a bypass pipeline should be designed for the electric control valve. Additionally, special attention must be paid to ensuring the installation location meets process requirements.
2. Pipelines should be cleaned to remove debris and welding slag before installing the electric control valve. After installation, the valve should be cleaned again to ensure no impurities remain inside the valve body; specifically, all valves should be fully opened when the medium is introduced to prevent impurities from causing jams. After using the manual override (handwheel) mechanism, it must be returned to its original neutral position.
3. As a field instrument, the control valve requires an ambient temperature range of -25°C to 60°C and a relative humidity of ≤95%. If the valve is installed outdoors or in high-temperature environments, waterproofing and cooling measures should be implemented; in areas with vibration sources, the valve should be positioned away from the source or equipped with anti-vibration measures.
4. Electric control valves should generally be installed vertically with the actuator facing upward. Inclined installation is permissible in special cases; however, if the inclination angle is significant or the valve is excessively heavy, additional supports should be installed to protect the valve.
5. Pipelines containing electric control valves should generally not be positioned too high above the ground or floor. If the pipeline height exceeds 2 meters, a platform should ideally be installed to facilitate handwheel operation and maintenance.